Commercial Mechanical Permits

The fees do not include the State Mandated fees. All permits will require an additional $4 State Fee and a $0.50 City of Yukon collection fee.

New / Remodel

  • Minimum Permit Fee: $35
  • 1/8 HP Motors to 4 HP or Tons: $10
  • 5 HP or Tons to 25 HP or Tons: $20
  • 26 HP or Tons to 60 HP or Tons: $35
  • 61 HP or Tons to 100 HP or Tons: $75
  • Over 100 HP or Tons: $150
  • Kitchen Exhaust System: $50, each
  • Forced Air Heater (split system): $35
  • Air Conditioner (split system): $35
  • Heat and Air Combination: $35

Boilers Each

  • Minimum Permit Fee: $50
  • Up to 30 HP: $50
  • 31 to 150 HP: $70
  • 151 to 300 HP: $150
  • Over 300 HP: $200

Alteration / Replacement / Remodel Each

  • Forced Air Heater: $35
  • Air Conditioner: $35
  • Coil and Duct only: $35
  • Kitchen Exhaust System: $50